Fall update on the progress occurring at the construction site of Limberlost Place at George Brown College’s Waterfront campus – See photographer Salina Kassam’s most recent photographs here, capturing moments of structural members rising throughout the first, second, and third floors of the building. The 9.2 x 7.2 metre grid is beginning to take shape across Limberlost Place’s footprint, with glulam columns, CLT slab bands and infill floor panels now being set in place.
Fall Update on Limberlost Place Construction Progress




