Fall Update on Limberlost Place Construction Progress

Fall update on the progress occurring at the construction site of Limberlost Place at George Brown College’s Waterfront campus – See photographer Salina Kassam’s most recent photographs here, capturing moments of structural members rising throughout the first, second, and third floors of the building. The 9.2 x 7.2 metre grid is beginning to take shape across Limberlost Place’s footprint, with glulam columns, CLT slab bands and infill floor panels now being set in place.



Previous Next